CITY
OF
HOMER,
Novak
RESOLUTION
07-45
A
RESOLUTION OF THE
WHEREAS, Resolution 07-14 updated
the Planning and; and
WHEREAS, This resolution set new
fees for right of way and section line easement vacations; and
WHEREAS, Normally utility easement vacations are treated differently; and
WHEREAS, After further consideration it is appropriate to not charge a
fee for utility easement vacations at this time.
PLANNING AND
ZONING DEPARTMENT
235-3106 or
235-8121 (Coordinates with Public Works)
Zoning Permit
(The following
fees, for Zoning Permits have been set by legislative enactments, Resolution
00-17 as authorized by HCC 21.42.060, Resolution 03-12(A), Resolution 03-159,
Resolution 04-35, and Resolution 04-98(S)(A),
Resolution 05-27(S) and Resolution 05-35.)
Zoning Permit Fees:
Single Family
/Duplex $200
Multi-Family/Commercial/Industrial $300, plus $50 per hour when over six hours of administrative time.
Change of Use fee
$50
Fees for commencing activities, without a permit, shall be assessed at the regular rate multiplied by one and one half (1.5) for Residential and two (2) for Commercial.
(The following fees have been set
by legislative enactments to HCC 14.08.035.)
ROW Permit - minor $90
major $90
Page 2 of 4
RESOLUTION 07-45
(The following fees have been set
by legislative enactments to HCC 11.08.040).
Driveway Permit Residential
$45
Commercial
$60
Long
$105
Administrative
Wetlands Permit
(General) $100
Publication Fees
Comp Plan
large
$20
Comp Plan
small
$10
Comp Plan
map
$ 5
Zoning Map
sm $ 5
lg
$25
Road Maint.
Map $ 5
Zoning Ordinance - HCC
21 $
15
Sign Permit
-
$ 50
Variance
-
$250
Storm Water Protection Plan Fee: $200
Conditional Use Permit Processing
Fees
Single
Family/Duplex
$200
Multi-Family/Commercial/Industrial
$500 for uses less than 8,000 sq. ft.
$1,000 for uses 8,001 sq. ft. to 15,000 sq. ft.
$2,500 for uses 15,001 sq. ft. to 25,000 sq. ft.
$5,000 for uses 25,001 sq. ft. to 40,000 sq. ft.
$8,000 for uses 40,001 sq. ft. and larger
Fees for
commencing activities, without a permit, shall be assessed at the regular rate
multiplied by one and one half (1.5) for Residential and two (2) for
Commercial.
Traffic Impact
Analysis and Community Impact Assessment – when required, applicant will be
charged for the actual cost of the study, plus a 10% administrative fee.
The City will be responsible for hiring and managing the study.
(Resolution 03-159 and 96-13 HCC 12.12.03)
Rezone $500
(HCC 21.63 repealed via Ordinance
03-21.)
Page 3 of 4
RESOLUTION 07-45
Flood Hazard Development
Permit
$200
Preliminary Plat
Processing Fee $300,
or $100 per lot, whichever is greater.(Resolution 03-159, 96-13 and 07-14)
Elimination of a common interior
lot line. $200.00
Right of Way and Section Line
Easement Vacation Application
Fee: (In addition to applicable preliminary
plat
fees). $300
Utility easement vacation: no
fee
Bridge Creek Watershed
Permit - permits are required for the Bridge Creek
Watershed Area. Although no fees will be charged for the permits outside of City Limits, the
evaluation process is still in effect.
Street Renaming Fees
(A) For name changes or naming of public dedicated streets other than
those named during the subdivision process:
(1) Street Naming Petition and hearing advertising
fee
$150
(2) Installation of each
(3) Replacement of existing City sign due to change
where no post is needed. Per
sign:
$ 80
The minimum fee shall be either a combination of 1 and
2 OR
1 and 3, above; however, all signs that need to be changed
and/or maintained by the City must be paid for prior
to installation.
(B) For
(1) Street Naming Petition and hearing advertising
fee
$150
(2) Installation of each
(3) If no public hearing or public notice is necessary, i.e.,
100% petition and no partial dedicated street
involved
No fee
(4) If no signs are
required
No fee
Page 4 of 4
RESOLUTION 07-45
PASSED
_____________________________
JAMES C. HORNADAY, MAYOR
ATTEST:
______________________________
JO JOHNSON, CMC, CITY CLERK
Fiscal information: Increased revenue to the general fund