Eroded bluff materials deposited on the beach

This project focuses on reducing bluff erosion in the Baycrest Subdivision by diverting the current storm drain configuration as well as capturing as much shallow ground water as possible and conveying it further down along the Sterling Hwy to Bidarki Creek.  As an added incentive to pursue this project, it may be possible to integrate micro-hydro works in two locations along the proposed stormwater diversion system.   This project is conceptual at this time and is being designed by Coble Geophysical Services.

Linked below you can find the storm drain plan for Baycrest.